Saturday, July 14, 2007
Previous Posts
- Evidence of me doing the riveting ..
- The spar and left doubler was riveted together ex...
- Here, i pre-assembled the already corrosion proofe...
- Disassembling the elevator for deburring in prepar...
- Notice earlier on, i have swapped using the more c...
- Finally the remaining holes i between the hinges ...
- After drilling all #30 holes..
- The centre hinge drilling is a bit challenging coz...
- and the right...
0 Comments:
Post a Comment
<< Home